Type | Key Steps |
---|---|
Wall-Hung Basin |
|
Countertop Basin |
|
Pedestal Basin |
|
Type | Key Steps |
---|---|
Floor-Mounted (S-trap / P-trap) |
|
Wall-Hung WC |
|
Ideal height from floor to urinal lip:
Checklist Item | What to Check |
---|---|
Flush Operation | Strong flow, no leakage from joints |
Water Seal Depth (WC) | 50–75 mm visible water in bowl trap |
Fixing Stability | No rocking or movement in installed fixtures |
Glaze Cleaning | Remove adhesive or tape marks gently |
Trap Odor Check | Ensure proper U-bend seal and air trap |